LINKWAY, BRIDGE & TUNNEL
SATOK SUSPENSION BRIDGE
Projects WhatsApp-Image-2020-11-29-at-11.31.14(1)WhatsApp-Image-2020-11-29-at-11.00.10-AMWhatsApp-Image-2020-11-29-at-11.03.59-AMWhatsApp-Image-2020-11-29-at-11.31.14-AM-(2)WhatsApp-Image-2020-11-29-at-11.31.14-AM SATOK SUSPENSION BRIDGE PROPOSED RECONSTRUCTION OF SATOK SUSPENSION BRIDGE, KUCHING DIVISION, SARAWAK. Type of Services Micropiling Woks Location Kuching, Sarawak Duration Feb 2018 – June 2018
Read MoreLDP – CABLE STAYED BRIDGE
Projects 1606802153175-6668180c-0ace-4426-9c9a-f03ec43de8a11606805357177-636f4e0f-e90f-409b-b4ca-ed5b1dbfc95d1606805509220-1aaa53c8-1b25-4f61-81e1-4ff52dfdbe141606805526213-55c3c230-bb31-4b1f-86a9-171c0165dcbe1606805539900-81ef22b3-c73e-4c59-9996-3156a89544a51606805554906-7f0957da-7ed4-4892-a190-16127ae925d4 LDP – CABLE STAYED BRIDGE COMPACTION GROUTING AND SOIL INVESTIGATION AT LDP – CABLE STAYED BRIDGE Type of Services Grouting and Soil Investigation Location Selangor, Malaysia Duration June 98 – July 98
Read MorePENCHALA TUNNEL. PACKAGE C (UMBRELLA ARCH)
Projects 1606809115947-e4466681-0b7f-4bdf-940e-af86d48e8a27_1606809155588-eb074f2c-06f0-4c73-8675-b3dad97dd4a91606809174797-ca53e1d6-fe3d-4cc9-9103-4d2fe6f78e5a_1606809285657-2fe15786-d1be-4272-98f8-02c23e8341471606809301634-166744d9-4b98-4d00-970d-d54b30e81a3e1606809314009-7bc0a040-1313-41c6-b942-e8f8aa631845 PENCHALA TUNNEL. PACKAGE C (UMBRELLA ARCH) MICROPILE INSTALLATION (UMBRELLA ARCH) WORKS PENCHALA TUNNEL. PACKAGE C Type of Services Micropiling Woks Location Selangor, Malaysia Duration July 2002
Read MoreMEDIUM TERM LINK (MTL) – MALAYSIA – SINGAPORE CROSSWAY
Projects DSC01163DSC01065DSC01103DSC01153DSC01161 MEDIUM TERM LINK (MTL) – MALAYSIA – SINGAPORE CROSSWAY MICROPILING WORKS FOR CADANGAN LALUAN MEDIUM TERM LINK (MTL) DARI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN BUKIT CAGAR, JOHOR BAHRU KE TAMBAK JOHOR (MALAYSIA – SINGAPORE CROSSWAY) Type of Services Micropile Works Location Johor, Malaysia Duration Apr. 2009 – July 2009
Read MorePROJECT AT SONG
Projects 20120611_11433720120611_114627P5020003P5060014WhatsApp-Image-2021-01-29-at-3.13.08-PM2013-07-25-09.36.37 LINKWAY, BRIDGE & TUNNEL PROPOSED JALAN SMK KATIBAS/NANGA MUSAH, SONG, BAHAGIAN KAPIT, SARAWAK Type of Services RC Bridge Works, RC Drainage and RC Box Culvert Soil nailing, Horizontal drain, Guniting and Micropile Works Location Kapit, Sarawak Duration Dec. 2007 – May. 2008
Read More